Free quote
Coverage area — Rabat

Aluminium joinery and façades in Rabat

Public facilities, institutional headquarters and upmarket residential schemes: we work across Rabat, Salé and Témara with a technical file that meets public-procurement requirements.

Projects where compliance has to be proven

Rabat concentrates government, institutional headquarters and public facilities. On these contracts, quality is not enough on its own: it has to be documented. System certificates, CE marking to EN 14351-1, glazing traceability, calculations, test certificates.

We produce that file in-house, which avoids waiting on a subcontractor at the moment the inspection body asks for it. And we hold contractual programmes, because on these contracts late-delivery penalties are not theoretical.

Rabat

What Rabat contracts impose

Three structural requirements on capital-city projects.

01

Documented compliance

CE marking, AEV classification, test certificates, profile and glazing datasheets, signed calculations. The file is assembled as the work proceeds, not reconstructed at handover.

02

Urban integration

Rabat is a World Heritage city and its planning rules govern façades. Colours, mouldings, grid proportions: we work these through with the architect at design stage, before submission.

03

Meeting the programme

On a public contract the programme is contractual. Our organisation — integrated fabrication, no subcontracted installation — is precisely what allows us not to depend on a third party to hold a date.

Institutional and residential

Ventilated façades, adjustable brise-soleil, technical joinery and automatic doors: our institutional references cover education, healthcare and office buildings, with the matching acoustic and hygiene requirements.

Residential Premium Housing Programme — Rabat
Rabat20211 450 m²

Premium Housing Programme

Institutional Agadir School of Architecture — Agadir
Agadir202612 500 m²

Agadir School of Architecture

In practice

01

600 km from the workshop

Distance is handled by planning: fabrication brought forward, grouped deliveries, on-site storage organised with the main contractor.

02

A crew assigned to the project

Installers are dedicated to the job and housed on site for its whole duration, which avoids breaks in rhythm.

03

Follow-up and site meetings

The project manager attends the weekly meetings and handles the interface with the design team and the inspection body.

What clients ask before signing — Rabat

Are you registered for public contracts?
We submit the usual administrative and technical documents and we have delivered public facilities. Eligibility depends on each consultation: send us the file and we will tell you whether we can answer it.
Do you provide calculations and test certificates?
Yes, systematically, and produced in-house. This is where many files stall at the end of a project; with us the technical file is built alongside the work.
Do you also work in Salé and Témara?
Yes, the whole Rabat-Salé-Témara area is handled through the same site organisation.

A project in Rabat?

Send us your drawings or simply describe what you need: you get a costed estimate within 48 working hours.